RBS vs Risk Breakdown Structure
Submitted by erickac on Tue, 03/19/2013 - 00:13
OK. I had this question on a practice test.
Which of the following represents a hierarchically organized depiction of resources to be used on a project?
A. OBS
B. BOM
C. RBS
D. None of the choices are correct
E. WBS
I thought the answer is D because it would be a Resource Breakdown Structure but the practice test said it was C. RBS. I thought RBS was Risk Breakdown Structure? I am confused.
Forums:


bpatel
Tue, 03/19/2013 - 00:40
Permalink
RBS is also Resource
RBS is also Resource Breakdown Structure. Output of Estimate Activity Resources
sspawar
Tue, 03/19/2013 - 00:47
Permalink
Dont follow old stuff. check
Dont follow old stuff.
check the relevancy with current/ applicable pmbok version.
5 options questions are old, based on old version, will confuse you, misguide you.
always check and follow material - based on 4th edition or for new 5th edition or the date of modification of material .