A production process has been defined as part of an industrial equipment manufacturing project. The process is intended to produce steel bolts with a length of 20 cm. The control limits are 19.955cm and 20.045cm.
The measurements made at the end of the process yielded the following results:
20.033cm, 19.982cm, 19,995cm, 20.006cm, 19.970cm, 19.968cm, 19.963cm, 19.958cm, 19.962cm, 19.979cm, 19.959cm.
What should be done?
1. The process is under control. It should not be adjusted.
2. A special cause should be investigated, the process should be adjusted.
3. The control limits should be adjusted.
4. The measuring equipment should be recalibrated.


dipti1pmp
Wed, 10/15/2014 - 05:33
Permalink
Rule of 7- apply here
2. A special cause should be investigated, the process should be adjusted.
as 7 points lie in one side of mean so the process is out of control and you will do a special cause investigation
got it?
jedwardmartin84
Thu, 10/16/2014 - 02:14
Permalink
Got it! Thank you so much!